Professional assignments

03 / 08 · REBAROQ

Development capacity

Site area and zoning ratios alone do not establish what a property can accommodate. We interpret planning requirements alongside physical site conditions and the intended use, giving the client a realistic starting point for a development programme.

Discuss your assignment
Vacant urban site with surveying equipment — illustrative image
Professional assignment · illustrative image

Scope of service

How we help

01

The development framework

We review applicable building and use requirements, together with known protections and restrictions. Permitted uses, scale and siting requirements are considered against the proposed programme. Any option that depends on a planning amendment is identified separately.

02

Practical site conditions

At a depth appropriate to the brief, the assessment considers site shape, levels, existing buildings, access and utilities. We identify conditions that may reduce the usable area, change the building arrangement or call for further specialist investigation.

03

A usable development brief

Planning and site requirements are brought together in a preliminary capacity assessment. This sets out meaningful options, questions for the next design stage and assumptions that still need confirmation. It makes the relationship between permitted ratios and a practical development programme clear.

What you receive

A clear basis for your next decision

An informed basis for an acquisition decision, comparison of potential uses or preparation of the design brief.

  • A summary of principal planning conditions and constraints.
  • A preliminary capacity assessment with key programme figures.
  • Outstanding questions and required specialist investigations.
Feasibility studies

Contact

Discuss your assignment

Contact me directly to discuss your property’s value, its potential uses or the preparation of a development project.