Professional background and references

FROM REGŐ LÁNSZKI’S PROFESSIONAL CAREER

Óbuda Gasworks

Budapest, District III · Óbuda

As Chief Executive Officer, I led the redevelopment preparation of the entire former Óbuda Gasworks site over three and a half years. The assignment brought together environmental and engineering preparation, industrial heritage conservation and the foundations for the site’s future role in the city.

Restored water and tar towers of the Óbuda Gasworks
Image credits
Globetrotter19 / Wikimedia Commons · CC BY-SA 3.0. Resized, cropped and subtly colour-graded for the web. The image remains available under the stated licence.
Scale of the former gasworks
27 ha
Assignment duration
3.5 years

The 27-hectare figure is the area of the historic gasworks recorded in a municipal study. The CEO assignment covered redevelopment preparation for the entire former gasworks site.

Brownfield regeneration and industrial heritage

Areas of involvement

01

Site and remediation preparation

Surveying contamination across the site and commissioning and securing approval of the remediation intervention plan.

02

Demolition and site clearance

Preparation and management of the demolition of twenty former institutional, warehouse and production buildings, including hazardous-waste handling.

03

Restoration of the tower ensemble

Restoration of the water and tar tower buildings, preserving the site’s distinctive industrial heritage.

The tower ensemble before and after restoration

Before restoration
Before restoration
Image credits
torobala / Wikimedia Commons · CC BY-SA 2.5 HU. Resized, cropped and subtly colour-graded for the web. The image remains available under the stated licence.
Following restoration
Following restoration
Image credits
Globetrotter19 / Wikimedia Commons · CC BY-SA 3.0. Resized, cropped and subtly colour-graded for the web. The image remains available under the stated licence.

Potential for a new urban centre on the Danube

The site’s scale, waterfront location and proximity to an intermodal transport hub offer the potential for a distinct urban district or local centre. The preparation sought to establish the conditions for complementary urban uses. This reference covers that comprehensive preparation, the completed demolition works and the restoration of the tower ensemble. The creation of a new district remains a future development opportunity.

Contact

Discuss your assignment

Contact me directly to discuss your property’s value, its potential uses or the preparation of a development project.